Connect with our Energy Storage Team at RE+ 2023 Sept 11-14

Built for Buy America and IRA compliance, including FEOC.  LEARN MORE

Fail-Safe, Carbon-Free Mobile Charging

10 portable energy storage units combined to provide over 1.5MWh of energy at race

Viridi’s energy storage system was uniquely suited to meet the challenging needs of the Race to the Clouds

Designed to provide energy at the point of need, the RPS150 BESS, was the solution to power EV’s throughout the event.

Challenge

With its remote geography, rugged environment, elevation, and wide temperature fluctuations, Pikes Peak is a difficult place to provide resilient electricity. Thin air at higher altitudes means less oxygen for the combustion process in traditional vehicles, giving EVs a significant edge over their fossil-fuel powered competition.

The Solution

Through paralleling (a feature all Viridi BESS are capable of) 10 mobile RPS150 mobile energy storage units were combined to provide up to 1.5MWh of energy at 300kW continuous power.

The Result

Thanks to Viridi’s “fuel tank” for electric applications, it took just 20 minutes to replenish the electric car’s 50 kWh ultra high-performance cell battery before making a record-setting second hill climb.

Industry

Outdoor Events

Location

Manitou Springs, CO

IMPLEMENTATION
  • 10 RPS150 Energy Storage Units

  • Scaled through “Paralleling”

  • Combined to provide over 1.5MWh of total energy

  • ViSTA® VCom IoT for remote monitoring of the BESS

Discover the full story–
Download the case study.

Sustainability Meets American-Made Innovation.

An image of 3 Viridi Employees from the service department

Experience unwavering support with technical assistance because we stand firmly behind our products.

Plus, capture incentives with Viridi’s BABA & FEOC-Compliant BESS.

Unlock possibilities with expert guidance from the leaders in battery safety.