Connect with our Energy Storage Team at RE+ 2023 Sept 11-14

Built for Buy America and IRA compliance, including FEOC.  LEARN MORE

Mobile BESS Powering Temporary EV Charging Infrastructure

When distributed outdoor events require flexible and low-emission power solutions, facilities teams rely on mobile, trailer-mounted RPS150 Battery Energy Storage Systems (BESS) to support.

RPS150 provides a clean, quiet alternative to traditional diesel generators, enabling rapid deployment without the need for permanent grid upgrades or extensive site work—critical in a temporary or space-constrained environment.

At this deployment, RPS150 delivered stored energy to a combination of Level 2 chargers for routine charging needs and Level 3 DC fast chargers that required higher power output for rapid vehicle turnaround. Intelligent power management software balances load distribution, ensuring optimal performance even during peak demand periods. When grid connection is available, BESS can act as a buffer—charging during off-peak hours and discharging during high-demand intervals. In an off-grid scenario as is pictured here, it operates as the primary energy source. This flexibility ensures uninterrupted operation with minimal utility demand charges, while also reducing strain on local electrical infrastructure.

THIS FLEXIBLE APPROACH HELPED ENSURE:

  • Uninterrupted operation
  • Reduced utility demand charges
  • Less strain on local electrical infrastructure

 

Deployments like this demonstrate how mobile energy storage can effectively enable scalable EV charging infrastructure in dynamic environments. RPS150 improves operational efficiency, reduces noise and emissions from incumbent diesel generators, and supports sustainability goals for the event without sacrificing performance. This model highlights a replicable approach for municipalities, event organizers, and commercial operators looking to accelerate EV adoption by overcoming grid limitations with modular, transportable energy solutions.

Industry

EV Charging Infrastructure

Location

Northeastern US

IMPLEMENTATION
  • One RPS150 BESS
  • Level 2 and Level 3 DC fast charger
  • Monitoring: ViSTA® Monitoring and Control Dashboard enables remote oversight with real-time alerts

Discover the full story–
Download the case study.

Sustainability Meets American-Made Innovation.

An image of 3 Viridi Employees from the service department

Experience unwavering support with technical assistance because we stand firmly behind our products.

Plus, capture incentives with Viridi’s BABA & FEOC-Compliant BESS.

Unlock possibilities with expert guidance from the leaders in battery safety.